JohnstonE-Wright PROJECTS
Todd & Becca wanted to make their home office spaces a bit more comfortable and finished. Work included paint, trim, shiplap boards on ceiling, built in storage, floating shelves, vinyl flooring, and 2 custom slab desks.
A new bathroom was also remodeled, replaced jacuzzi tub with shower unit, vinyl floor, floating shelves, custom distressed mirror frame, shiplap on walls, new sink/toilet, removal of a door, drywall work and paint.
Keith worked with Todd and Becca on creative and color solutions for the above projects.
Driveway resurfacing will take place in Spring 2022.
A new bathroom was also remodeled, replaced jacuzzi tub with shower unit, vinyl floor, floating shelves, custom distressed mirror frame, shiplap on walls, new sink/toilet, removal of a door, drywall work and paint.
Keith worked with Todd and Becca on creative and color solutions for the above projects.
Driveway resurfacing will take place in Spring 2022.